Ealing Passivhaus
Ealing, London

KEY FACTS
  • Client: Ealing Council

  • Project cost: Undisclosed

  • Status: Under construction

  • Category: Residential

KEY ENVIRONMENTAL DATA

Predicted domestic emissions

  • % improvement on Part L: 61.00%

  • Regulated emissions: 25.1 tCO2/yr

AWARD
  • Inside Housing Development 2021 | Shortlisted

Construction has commenced on 134 mixed-tenure homes across six redundant and underused brownfield sites in Ealing for Ealing Council.

The six developments, of varying types and scales, will include 70% affordable homes with 73 at London Affordable Rents.

The homes have been designed to Passivhaus standards to reduce energy consumption, address fuel poverty and meet Ealing Council’s commitment to deliver net zero carbon homes. The Passivhaus standards for the building fabric and the use of MVHR, PVs and air-source heat pumps will see a 61% improvement on Part L for a typical flat.


Related projects

¿ Riverside Road

¿ Convent Way Estate

¿ Sherwood Terrace

¿ 495–500 Abbey Road